| Geological
investigation reports concerning earthquake areas have stated that
the ground fully complies with the regulations.
Construction of the complex will
be performed under the control of Manavgat Yapi Denetimi A.S. according
to and in compliance with the construction norm TS/EN ISO 9001:
2000, 15 years guarantee.
In the complex:
The entrance and all walk ways will
be paved. The park areas will be grassed.
There will be a swimming pool with
approx. 85m2 area.
There will be swimming pool for
children.
A shower will be provided near the
swimming pool.
Non slippery floor in pool area.
The complex will have interior and
exterior lighting.
All outdoor areas will be planted
with flowers and trees.
The complex will have night security.
Car parking areas will be provided.
The construction:
The construction will be reinforced
concrete.
The walls will be constructed of
bricks.
All walls will be insulated for
heat and noise control.
Each block will have a substructure
sewer system.
The exterior walls will be painted
high quality emulsion paint.
The interior walls will be plastered
and painted high quality emulsion paint.
The building’s entrance floor
and stairs will be marble.
A solar energy system will be supplied
which is supported by an electrical heating support system.
Covered balconies will be tiled with ceramic tiles and edged in
marble with the railings being constructed of ironwork.
The roof construction:
Insulation against humidity.
3-fold insulation against heat and
cold.
Roof tiles will be fireproof, gutters
set in concrete.
All drain pipes will be of plastic.
The roof will be underfaced and
plastered.
Interior:
Two Air-conditioning units are provided
one in each of the salon and master bedroom.
ADSL connection will be installed.
The inner walls will be plastered
and painted with satin washable paint
Decorative coving will be provided
between the ceiling and the walls.
Tiles and floor coverings:
First class ceramics will be used
in the apartments. Our customers will be able to select these if
they purchase off plan.
Bathrooms are fully tiled from floor
to ceiling and the ceiling is PVC.
Windows and doors:
The front door will be a safety
door constructed of steel. Interior doors will be wooden American
panel.
PVC double glazed windows with insulation
are installed throughout.
Kitchen:
The kitchen units will be wooden
MDF Lam. The Kitchen will be fitted with a marble worktop or rosa
porino granite worktop.
The wall between the worktop and
the cupboards will be tiled in ceramic wall tiles.
Ventilation:
The bathrooms, toilets are fitted
with a mechanically operated ventilation system.
Bathroom:
The bathroom will be fitted with
designer bathroom furnishings. All bathrooms will be fitted with
a toilet.
General information:
Energy savers and smoke detectors
will be fitted as standard.
White fittings and air conditioning
units come with a 2 to 3 years guarantee.
Adequate electrical sockets will
be fitted in all rooms including terraces.
Telephone connections are provided
in the salon and bedrooms.
A satellite socket will be provided. |